How To Vacuum The Ultra-Low Temperature Freezer Refrigeration System?
LNEYA ultra-low temperature freezer indoor and outdoor connection has been completed, observe the oil pump oil mark indication to see if there is enough oil, and then start the vacuum pump to see if it is normal. Then unscrew the large valve back cover nut and the fluorine injection nozzle nut, connect the pressure gauge low pressure, connect one end of the thimble to the refrigerant nozzle side, open the low pressure meter switch, vacuum, and quickly show that the vacuum is completed. It may be the vacuum of the yellow tube that the gauge is not open.
The specific time for vacuuming in the ultra-low temperature freezer is about 20-30min. When the pressure gauge pointer is ≤-0.1MPa, then close the pressure gauge low pressure valve, then close the vacuum pump, hold the pressure, observe the pressure gauge pointer for 5 minutes, and see if the pointer rotates. If the system pressure leak is greater than -0.08Mpa, the system has a leak.
If the LNEYA ultra-low temperature freezer compartment leaks, it is necessary to check the possible leak points and repeat the above-mentioned operation vacuuming process, open the small valve and remove the meter. Special attention: After confirming that there is no leakage point, open the small valve spool a little. When the pressure (low pressure) reaches 0.05MPa, close the small valve and quickly remove the pressure gauge (very critical point). Note: This step is to make the system become positive pressure, avoiding the air entering again during the unloading process, and the vacuum is invalid.
Special attention should be paid when opening the LNEYA ultra-low temperature freezer line: first open the small valve completely, and then tighten the valve back nut immediately after opening the large valve completely. Need to pay attention: Be sure to open the valve plug completely, so as not to affect the performance of the ultra-low temperature freezer in the later stage.

Of course, after vacuuming, pay attention to leak detection. Specifically, check each interface and shut-off valve of the internal and external machines first, and apply soapy water to the suspicious points with a sponge block. Each stay should be no less than 3 minutes. If bubbles are formed, There is a leak. At the same time, note that the soapy water should not be too thin, otherwise it will affect the inspection. In summer, the leak should be detected in the stop state, and in the winter, the leak should be detected during the heating operation.
After the vacuum of the ultra-low temperature freezer refrigeration system, users are advised to pay attention to the leakage of the system to avoid the presence of leaks.
関連推奨品
-
新エネルギーモーター試験水冷システムの故障率を下げるには?
1000新エネルギーモーター試験水冷システムは、使用中の使用に注意を払う必要があり、どんなに良い設備を長期間使用しても、多かれ少なかれ何らかの問題が発生する。では、どうすれば使用中の設備の故障率を最小化できるのか。
詳細を見る -
-
単一流体加熱冷凍システムの温度サイクル故障解析
1081各メーカーの一流体冷暖房システムの性能は異なります。LNEYAでは、冷暖房温度の問題を解決するために、高構成の単一流体冷暖房システムの開発に取り組んでいます。
詳細を見る -
小型冷熱衝撃テストボックス使用上の注意
1060小型熱衝撃試験器は非防爆製品です(防爆はカスタマイズする必要があります)、可燃性または爆発性ガスのある環境で使用しないでください。小熱衝撃を避けるために、テストボックスは故障しています。
詳細を見る